What a shower tile job looks like with our crew
Most of the showers we tear out in Dearborn were built the same way. A steel tub or a shallow pan, tile set on plain drywall, and a bead of caulk doing the work a membrane should have done. It holds for a while. Then the grout in the corner turns dark, the floor by the door feels soft, and the ceiling below shows a stain. We see it in the brick bungalows off Warren Avenue and in the post war ranches out toward Telegraph Road. The tile is rarely the problem. What sits behind the tile almost always is.
So we start behind the wall. We strip the old shower down to the studs and look at what the water already reached. Rotted framing gets replaced. Then the base goes in with a slope toward the drain, the walls get a board made for wet areas, and every corner, seam, and screw head gets sealed. On a full build we flood test the pan before a single tile goes up. Water sits in the base overnight and we come back in the morning to check the level. That test is boring, and it is the part that keeps the room below dry.
- Waterproofing goes in as a system, not as a bead of caulk. Membrane, corners, drain flange, and board all tie together before any tile is set.
- We flood test the shower base and let it sit overnight, so a leak shows up on our watch instead of yours.
- The floor gets a real slope to the drain, so water leaves the pan instead of standing in the low corner and soaking the joint.
- Layout gets planned before we spread mortar. Full tiles land where the eye goes, and the cuts hide in the corners.
- One crew handles demo, prep, tile, grout, and cleanup, so nobody stands around waiting on another trade to show up.
Timing depends on scope more than on square footage. A standard tub surround in a Dearborn bungalow usually runs a few days of work, with drying time between steps. A full walk in shower with a curb, a bench, and a niche takes longer, because the base, the membrane, and the flood test each need their own day. We do not rush a cure to hit a date. Grout goes in after the mortar has set, sealer goes on after the grout has cured, and the glass door goes last. You get the real schedule up front, plus a call if anything behind the wall changes it.
If your shower is leaking, or the tile from 1962 has finally had enough, call us and tell us what you are seeing. We will ask a few questions, look at the space, and give you a straight scope of what needs to happen. No pressure, and no long sales visit at your kitchen table. We work in Dearborn every week, plus Dearborn Heights, Melvindale, Allen Park, and the rest of the west side of Wayne County. Tell us when you are home and we will fit the visit around that.





